Description:
- The projects include the preparation of materials and the implementation of the works on two floors each floor area of 800 m².
- The building contains 8 lecture halls,18 classrooms, Management and teacher rooms and full services as air conditioning, electricity, parking lots and outdoor gardens.
- The project includes a 2km length road connecting the building entrance with the main road.
- Generally, the project has been implemented as per technical specifications and contract requirements.
Start Date: 08/02/1974
Completion date: 10/05/1975
The project amount: $800,000,00
Duration: 14 Months
Beneficiary: Al-Basrah University
Description:
- The work includes the preparation of materials and the implementation of three schools in different locations in the city of Basrah with two floors for each school and with an area of 900 m² per floor, each building contains 18 classrooms, rooms for teachers and management, internal courtyards, gardens and fences with different lengths for each school, as per technical specifications and contract requirements.
Start Date: 12/05/1985
Completion date: 20/01/1987
The project amount: $1,100,000,00
Duration: 20 Months
Beneficiary: The Local Administration in Al-Basrah
Description:
the implementation of the concrete structure of the building which consists of two floors each floor is 4 meters high and with an area of 1250 m² per floor. The building contains 10 lecture rooms on each floor in addition to the deanship and professor’s rooms.
The implementation of the internal walls with bricks with all finishing works, the plastering, paint and architectural interfaces of the building.
Air conditioning, electrical works, parking lots and Gardens as per technical specifications and contract requirements.
Start Date: 25/2/2002
Completion date: 18/3/2003
The project amount: $720,000,00
Duration: 13 Months
Beneficiary: Al-Basrah University
Description:
- Build-up the concrete structure of the building and concrete terraces for four lecture rooms of 50 seats per each with a height of 7m, and offices for management and professors, and the implementation of all services related to the finishing work with parking lots ….. etc as per technical specifications and contract requirements.
Start Date: 29/09/2002
Completion date: 18/3/2003
The project amount: $680,000,00
Duration: 6 Months
Beneficiary: Al-Basrah University
Description:
- Designing, implementing and equipping of Al Manathera and Kufa education directorate buildings in both the Manathra and Kufa cities under “turnkey” job, where all directorate requirements had been taking into consideration and executed in a very elaborated method and was fully prepared,In addition to other services such as water and sewage networks, slabbing internal roads and sidewalks as well as gardens and parking spaces.
Start Date: 11/08/2010
Completion date: 12/12/2011
The project amount: $ 2,720,000,00
Duration: 16 Months
Client: Al Najaf rebuild commission
Beneficiary: Al Manatherah Education Directorate and Al Najaf Education Directorate