Design & Build Main Camp for Gulf Dredging & General Contracting Co. at the Naval Base-Umm Qasr

Description:

  • Designing and constructing the main camp that includes offices for employees, a meeting room, a residence, a restroom and a restaurant, a laundry, and parking.
  • Supplying and installing two generators of 250 kV and 500 kV.”

 


 

Start Date: 1/12/2014

Completion date: 1/3/2015

The project amount: $1,906,000,00

Duration: 3 Months

Client: Gulf Dredging & General Contracting Co.-US Army Corps of Engineers

Management, operation, and maintenance of Main Camp for Gulf Dredging & General Contracting Co. at the Naval Base-Umm Qasr

Description:

Providing maintenance services, food services for 300 people, security and protection services at the campsite, in addition to providing electricity 24/7.

 


 

Start Date: 1/3/2015

Completion date: 1/9/2018

The project amount: $1,890,000,00

Duration: 42 Months

Client: Gulf Dredging & General Contracting Co.-US Army Corps of Engineers

Design & Build a Floating Pier at the Naval Base -Umm Qasr

Description:

  • Implementation of a steel structure with an area of ​​2100 m².
  • Supplying materials and making a shed with dimensions of 30 m * 70 m and a height of 7 m.
  • Design, supply, and installation of 9 fuel tanks with a capacity of 100,000 liters per tank.
  • Supplying and installing a network of pipes to transport fuel from the tanks to the floating pier.
  • Design, supply, and installation of two water tanks with a capacity of 100,000 liters per tank, with the supply and installation of pumps and a network of pipes for the transfer of water from the tanks to the floating pier.
  • Design, supply, and installation of two water tanks with a capacity of 100,000 liters per tank, with the supply and installation of pumps and a network of pipes for the transfer of water from the tanks to the floating pier.
  • Supplying and installing an air compressor system with a capacity of 1000 cubic feet per minute with all the pipes for transporting air from the air compressor system to the floating pier.
  • Design, supply, and installation of a fire extinguishing system inside the shed.

 


 

Start Date: 1/6/2016

Completion date: 1/9/2018

The project amount: $5,000,000,00

Duration: 27 Months

Client: Gulf Dredging & General Contracting Co.-US Army Corps of Engineers

Marine Dredging works for the quantity of 960000 m³ at the Naval Base-Umm Qasr

Description:

  • Carrying out marine dredging works for the private coastal area near the floating pier, at an area of 800 m long * 300 m wide * 11 m deep in the lowest islands.
  • The mud is transported by a special dredger for such works through a network of pipes with a length of 2800 m to special basins for sedimentation of mud.

 


 

Start Date: 10/10/2015

Completion date: 10/1/2018

The project amount: $6,000,000,00

Duration: 27 Months

Client: Gulf Dredging & General Contracting Co.-US Army Corps of Engineers

Supply and installation of 50-inch carbon steel pipe with a length of 2800 m with Extending a Polyethylene pipe with a diameter of 30 inches and a length of 1800 m with the implementation of basin assembly work at the Naval Base-Umm Qasr

Description:

  • Installing the pipe on fixed bases and burying it under the ground at the intersection of the roads within the path to the basins with the maintenance period for a year after the completion of major dredging works.
  • Design and implementation of three basins to collect mud from the dredging output, with an area of 4,500 m² for each basin, and a depth of 4 m.
  • Supplying and laying a Polyethylene pipe with a diameter of 30 inches and a length of 1800 m to transfer mud-free water deposited at the bottom of the basins in the sea, using a pump of 350 m³/hour.

 


 

Start Date: 1/6/2016

Completion date: 1/10/2016

Duration: 4 Months

Client: Gulf Dredging & General Contracting Co.-US Army Corps of Engineers